...
Read More...
Read MoreNaples-Bari railway line, Cancello-Frasso section https://www.europea92spa.it/wp-content/uploads/2018/07/linea-ferroviaria-napoli-bari-tratta-cancello-frasso.mp4 https://www.europea92spa.it/wp-content/uploads/2018/07/linea-ferroviaria-napoli-bari-tratta-cancello-frasso-2.mp4...
Read More...
Read More...
Read MoreConstruction work on spritz beton installation and rockfall protection network. Algeria site. Contractor: Astaldi...
Read MoreConstruction of the Port Djen Djen-East-West highway Wilaya de Jijel. Algeria site Contractor Rizzani De Eccher...
Read MoreCivil works for the seismic adaptation of the offices and operational area of the National Control Center of the Terna SPA headquarters Via Palmiano 101 (ROME)...
Read MoreCivil works for the seismic adaptation of the offices and operational area of the National Control Center of the Terna SPA headquarters Via Palmiano 101 (ROME)...
Read MoreCivil works for the seismic adaptation of the offices and operational area of the National Control Center of the Terna SPA headquarters Via Palmiano 101 (ROME)...
Read MoreRailway axis Monaco/Verona – Brenner Base Tunnel. Construction section “Mules 2-3” Campo di Trens site (BZ, Italy) Contractor: BTC...
Read MoreConstruction of the High Speed Railway Line Oued Tlelat – Tlemcen. Algeria Site. Contractor: Società Italiana per Condotte d’Acqua...
Read MoreBidbid Surl road doubling. Oman...
Read MoreConstruction and completion of the Piale natural tunnel, north and south carriageway as well as all connected works. Contractor: Reggio Calabria – Scilla...
Read MoreConstruction of the Pilone natural tunnel, north and south carriageway as well as all connected works. Contractor: Reggio Calabria – Scilla...
Read MoreConstruction of the Paci natural tunnel, north and south carriageway as well as all connected works. Client: Reggio Calabria – Scilla...
Read MoreConstruction of the 1st lot of the Como ring road, of the 1st lot of the Varese ring road and of the A8-A9 section of the Dalmine-Como-Varese-Valico del Gaggiolo motorway link and related...
Read MoreConstruction of the “Kerrada” dam in Algeria. Customer Astaldi...
Read MoreConstruction work on the Kramis dam in the Mostaganem wilaya in Algeria. Contractor Astaldi...
Read MoreConstruction of the S. Filippo natural tunnel, north and south carriageway as well as all connected works. Contractor: Salerno-Reggio Calabria...
Read MoreConstruction of the E90 section of the SS 106 Jonica from the Squillace junction to the Simeri Crichi junction and extension work on the SS 280 of the Due Mari from the San Sinato junction to the Germaneto junction. Contractor: Astaldi...
Read MoreRaw building works of tunnels, artifacts and stations, underground utilities and superficial arrangements of the Affori-Comasina section of line 3 of the Milan underground. Contractor: Metropolitana Milanese...
Read MoreRealizzazione al rustico delle stazioni di Parco di Centocelle e Alessandrino della costruenda linea C della Metropolitana di Roma. Committente MetroC...
Read MoreSS106 Jonica Nuovo Ponte Fiume Ancinale Soverato (Catanzaro) construction...
Read MoreConstruction works for the Valle Caudina-Pianodardine ring...
Read MoreHigh speed railway line Rome-Napoles, Roma La Rustica junction (Roma) construction...
Read MoreHigh Speed Railway Line – Rome – Naples section: for the Caivano lot (NA), Jacked-box tunnelling -concrete monoliths- under the Naples...
Read MoreCompletion works of the tunnel called GN1D and of the structures of the Lolli E Giustizia stops, as part of the electrified doubling of the Palermo Centrale – Carini railway section, passing through...
Read MorePhase 1 tunnel assessment plan under the responsibility of direction VII Pescara section of the A14 Bologna-Bari-Taranto motorway. Idremolition and milling on the cap and / or piers of portions of the tunnel. Spritz beton...
Read MoreExecutive design and contract execution of the construction works of the Naples-Bari railway line. Treats Frasso...
Read More